One billion pounds for Sohag drinking water and sanitation projects during 2021
Sohag Governorate has recently witnessed a major boom after entering the initiative of President Abdel Fattah El -Sisi, "a decent life", as the dreams of many of the people of Sohag Governorate have become a tangible reality from developing infrastructure and development in various sectors more than one billion pounds for drinking water and sanitation projects in Sohag during2021
You lost more than a billion pounds during the year 2021 to support the drinking water and sanitation sector in Sohag Governorate
Engineer Mamdouh Raslan, Chairman of the Board of Directors of the Holding Company for Drinking Water and Sanitation, said that Sohag's drinking water and sanitation services have been improved and a number of projects that contribute to providing a clean cup of water to citizens and safe disposal of wastewater were improved.
Engineer Mohamed Salah El Din Abdel Ghaffar, Chairman of the Board of Directors of the Drinking Water and Sewerage Company in Sohag and the Managing Director, indicated that in the field of drinking water and sanitation projects, an amount of 53 million pounds was allocated for replacement and renewal for drinking water and sanitation facilities, and the project of a health disbursement of Araba Abu Al -Dahab and Araba AbuAziz, who benefits from 57 thousand people and includes 4 healthy exchange rates of 27.8 million pounds and a decline network of 56135 meters, at a cost of 134.7 million pounds and a treatment plant with a design capacity of 6100 cubic meters per day at a cost of 83.8 million pounds and a sanitation farm on an area of 228 acres, at a cost of 61.3 million pounds, as well as sewage projects for the villages of Al -Ghayzat and Al -Batat and Al -Qudah at the Maragha Center, which benefits 58 thousand citizens..1 million pounds.
And three lifting stations at a cost of 26.4 million pounds and a health exchange treatment plant with a design capacity of 6300 cubic meters per day at a cost of 94.6 million pounds, in addition to the completion of the first stage, a health exchange project, which benefits 9 thousand citizens, at a cost of 20 million pounds, health exchange projects of the villages of Al -Mazalwa, Al -Hamidah, and Dummu, which includes 3 lifting stations, slope networks, and expulsion line at a cost of 145.6 million pounds, and the two developed drinking water stations No. 3 and 4 in the village of Al -Hawawish in Akhmim Center, whose production capacity is 180 liters per second..Also operating the compact Fujli water station, which operates with a design capacity of one thousand cubic meters per day at a cost of 15 million pounds and nourishes 12 thousand people in the village of Fujali, and the completion of the transfer of a health treatment plant for Sohag West, whose design capacity is 50 thousand cubic meters and a treatment plantCola health, with a design capacity of 55 thousand cubic meters, from bilateral treatment to triple treatment at a cost of 283.5 million pounds, and the financial amounts allocated to tidal and reinforcement plans for drinking water and sanitation networks in all governorate centers amounted to 86 million pounds..
Also, sanitation projects are being implemented within the presidential initiative as a decent life in the villages of Nakzali Daoud, Sheikh Rahouma, Hajar Musta and Al -Safeeha in the Tahta Center, which costs 207 million pounds. The amount of 107 million pounds was allocated to extend the drinking water service to the disadvantaged villages in Sohag, where water networks and wells are strengthened and strengthenedAnd replace and renew the water lines in all centers of Sohag Governorate, and the Engineering Authority of the Armed Forces is implemented drinking water and sanitation projects in 181 villages in the centers.
And 7 drinking water and sewage water stations obtained the international certificate in the sustainable technical development TSM. These stations are the water station of Salem Surgical candidate, the Nida Surface Water Station, its expansions, the surface facilities station, the Maragha water station, Juhayna, the candidate, the water station in Zeroura, a healthy exchange treatment station.
In the field of drinking water quality, 300,000 drinking water samples were raised and rehabilitated 5 water laboratories and a sewage factory to obtain the ISO Certificate 17025: 2017, and the water stations of the Mobile Foundation and the children of the sheikh, the integrated children of the water, obtained a safety and safety certificate.It reached 15376 cubic meters, the completion of the environmental sanitation plan for 11 surface stations, obtained 66 environments approval for new projects, monitoring 1615 industrial establishments, and starting the establishment of the Central Perfection Laboratory of 13 million pounds.
In the field of customer service, the number of new subscribers to drinking water service during this year was 20600, and the number of subscribers to the sanitation service reached 2358 subscribers, and 6966 meters and calibration of 5814 meters were examined for citizens, and the immediate printing system for drinking water bills has also started within the framework of transformationDigital for services provided by the company to citizens, where 100 immediate printers were provided and 10 prepaid prepaid devices are provided in all governorate centers, as well as starting to develop 6 customer service centers to provide services to citizens at ease and ease.
In the field of solving citizens' complaints, during this year, 110 thousand complaints were received through the hotline service 125 to receive drinking water and sewage complaints or through the number 01207125125 from the mobile phone or the number 01273195125 for the WhatsApp service or through the mobile phone application (HCWW 125) or registerComplaint.Scww.com.EG that these complaints varied between breaking a pipe, interruption, weakness and change in water specifications, breaking a fire, as well as complaints of breaking, healthy extinguisher, requesting a vehicle, and stealing the sink cover and accounting complaints.
In the field of spreading water awareness, the first electronic game was launched to educate young people about how to conserve water and that more than 100,000 citizens were educated through the implementation of awareness seminars for Islamic and Christian clerics and opinion leaders in the villages, as well as implementing water convoys for citizens in all villages and hamlets of the province and introductory trips to water stations Drinking and sanitation, as well as awareness activities for school students and citizens ’opinion polls about drinking water and sanitation services and plumbing workshops for women to teach them how to repair household items and campaigns to educate citizens. And the dangers of Ethiopia and filters on public health and the importance of pushing the bills for the company's continued to perform its duties.
A decent life changes the reality of the countryside in the village of "Umm Doma" in the Tama Center
Sohag Governorate is also preparing, during the next few days, to announce the village of "Umm Doma" in the Tama Center, north of the governorate, as the first model village in the targeted villages within the presidential initiative to develop the Egyptian countryside "a decent life".
Maj.To become the first model village in Sohag, after most of the projects have been completed and the rest of the service and development projects in the village were neglected to finish.
"Al -Fiqi" indicated that the village of Umm Doma witnessed projects to deliver drinking water services, sanitation, natural gas, communications, and the establishment of the Citizen Services Complex "Long Live Egypt", the Agricultural Services Complex, the establishment and development of a number of schools in the village, the development and raise of the efficiency of the youth center, and the establishment ofAn advanced family medicine unit, in addition to creating an ambulance, a fireplace unit, and the family development center, as well as lumping canals, developing the post office, creating a "Umm Doma" electricity distribution panel, and creating a new health unit according to the comprehensive health insurance model.
He drew attention to the start of paving the internal roads in the village, painting home facades, coordinating general sites for projects, and beautifying the roofs of schools and government departments;To become "Umm Doma" already the first model village, and a realistic picture of the initiative of President Abdel Fattah El -Sisi, President of the Republic to develop the Egyptian countryside "a decent life".